How long it takes to build a small business website

By Dave Newman ·

The honest answer is "it depends," but it depends on a few things you can mostly control. A simple site with five or six pages can launch in about four weeks. A custom site with a lot of pages, a booking system or a store usually takes eight to ten.

What happens, week by week

A typical small business site moves through five stages:

  1. Planning (week 1). Goals, the list of pages, and what each page needs to do.
  2. Content (weeks 1 to 3). Page copy, photos, team bios, service details. This runs alongside design.
  3. Design (weeks 2 to 4). The homepage first, then the other page types. One or two rounds of changes.
  4. Build (weeks 3 to 7). The site gets built, connected to forms, analytics and search tools, and tested on phones.
  5. Launch (final week). Redirects from old pages, a last check, and the switch.

What actually slows a project down

It's rarely the design or the code. It's almost always content.

  • Waiting on copy. Owners are busy, and writing about your own business is hard. A copywriter who interviews you for 30 minutes can save weeks.
  • Waiting on photos. Stock photos are fine to start, but plan the shoot early if you want real ones.
  • Too many decision makers. Pick one person to approve each stage.
  • Scope creep. New pages and features added mid-project push the date. Write them down for phase two.

How to launch faster

  • Launch with the pages that bring in business, and add the rest after.
  • Have your logo, colors and any existing copy ready before kickoff.
  • Book your review time on the calendar so approvals don't sit for a week.

Need something live this month?

If the bigger project can wait, a homepage redesign gets your front door looking current in a fraction of the time. When you're ready for the full build, our new website projects come with a schedule up front. Budgeting first? See what a small business website costs. Replacing a site that already ranks? Read how to redesign without losing your rankings.

Questions people ask

Can a website be built in a week?

A one-page site or a simple template can. A custom site that ranks and converts needs time for planning, content and testing.

Does it take longer to redesign than to build new?

Often about the same. A redesign adds the work of mapping old pages and setting up redirects so you don't lose search traffic.

What do I need ready before we start?

Your logo, a list of services, any copy and photos you already have, and access to your domain and current site.

Send a URL. We'll show you what it could be.

Get the free PDF mock